Fale conosco pelo WhatsApp
Peripheral Protection

Primary tray

Primary Protection Trays

The primary protection tray should be installed shortly after the first slab is cast, at a height equivalent to a ceiling height above ground level, and throughout the perimeter of the building.

SOLICITE UM ORÇAMENTO

The Protection Trays are used to prevent material falling around the building, ensuring safety and higher productivity. The primary model should be installed shortly after the first slab is concreted, at a height equal to a ceiling height above ground level, and throughout the perimeter of the building.

- Hookless Option: The Primary Protection Tray can be fixed by Parabolt, when there are no lead-in waitings on the slab and with the Tray support when there is no waiting in the work to fix the Trays.

- Hook Option: Hook fastening system (Needs Bracket), are fixed in a bolt-on hold on the U-shaped slab, eliminating the need for pins in the lock.

SPECIFICATIONS
TECHNIQUES

TECHNICAL SPECIFICATIONS
- Primary Model: Length 2,50m + length of 0,8m at 45 °
- Built in 2mm U profile
- Vertical support profile sheet metal 3,35mm
- 150kg distributed load capacity
- 2 OPTIONS: “Hook” (Need Support) or “No Hook” (Straight on Slab) Fastening System
- EPOXY Painting
- Tray, mandatory equipment in buildings above 4 floors.
- Recommended maximum spacing of 1.2m
- This equipment aims to protect against falling workers and projection of materials.
- Has opening for fitting and fixing the batten, which facilitates the fixing of Madeirit

ACCESSORY:
Tray Support - Used when there is no wait on site for Tray attachment.

Request a quote
Simpler and more effective planning

Simpler and more effective planning

Up to 45% more agility in the work

Up to 45% more agility in the work

Best value for money compared to the competition

Best value for money compared to the competition

Primary tray
Request a quote

OPINIONS ABOUT
Primary tray

Your review was successfully submitted and will be published shortly.


Leave your opinion